Quality assurance

Check before
we proceed.

Quality is controlled at defined construction stages—while work is still visible, measurable, and correctable.

Detailed reinforcement prepared for inspection before installation
Reinforcement preparation · Redsoul Villa
InspectorSite engineer
Critical hold pointsBefore pours and concealment
RecordsLABHYA App and handover file

The control principle

Inspect. Record. Resolve.

Important work is reviewed before the next activity covers it. Observations are identified early, corrections are tracked, and the project advances only after the relevant stage has been reviewed.

01

Approve

Materials are presented to the client before procurement.

02

Inspect

The site engineer checks work at defined stage hold points.

03

Correct

Observations are addressed before subsequent work proceeds.

04

Record

Progress, snags, and handover documentation remain visible digitally.

Stage-wise checkpoints

Quality where
it matters.

Final acceptance criteria depend on the approved drawings, specifications, applicable standards, and signed contract for each project.

01

Setting-out and excavation

Review of building position, reference information, excavation extent, and levels before foundation work proceeds.

02

Foundation reinforcement

Review of reinforcement arrangement and readiness before concrete placement.

03

Formwork and pre-pour readiness

Inspection of the structural work front before concrete pours, including visible interfaces and required provisions.

04

Concrete placement and curing

Site supervision during placement and follow-through on the agreed curing process.

05

Masonry and surface preparation

Review of visible alignment, interfaces, and readiness before finishes progress.

06

Electrical and plumbing services

Inspection before services are concealed by plaster, screed, ceilings, or other finishes.

07

Waterproofing

Review of substrate preparation, application stage, and applicable testing before covering work.

08

Flooring, doors, and finishes

Visible checks covering alignment, interfaces, finish consistency, and incomplete work.

09

Fixtures and final testing

Review of installed items and applicable system checks before snag closure.

10

Snag and handover review

Written observations are closed and the final handover document is made available through the LABHYA App.

Documented visibility

A record the client can follow.

Daily

Progress updates

Daily site progress through the LABHYA Mobile App, supported by WhatsApp communication.

Before purchase

Material approvals

Client approval precedes procurement of proposed project materials.

Before handover

Snag records

Written observations and their closure remain available through the app.

At completion

Handover and warranty

Digital handover documentation and the contract-defined 10-year warranty record.

Warranty note: The 10-year warranty applies according to the scope, terms, conditions, and exclusions stated in the signed contract for the individual project.